Mobility News · Battery & Charging

What if your fast charging site could grow with the demand instead of being rebuilt for it?

ChargePoint Battery & Charging Update October 19, 2026

Our CTO Hardware, Hossein Kazemi, takes you up close to the Express Solo and explains the thinking behind our Express architecture.

☑️ Modular by design: start with the power you need today and scale up as demand grows, without starting from scratch.

☑️ Smart power sharing: power is distributed dynamically, so every vehicle gets the right amount of energy at the right time.

☑️ Compact footprint: the Solo fits where space is tight, which opens up more locations for DC fast charging.

The result is fast charging infrastructure that's easier to plan, quicker to deploy and ready for whatever comes next.

Watch the video and let us know: what matters most to you when planning a fast charging site?

Why this matters for talent

Messaging around modular charging sites that can grow with demand instead of being rebuilt supports continued investment in ChargePoint's hardware and deployment engineering, since that kind of modular design has to be built and field tested before it can be marketed. ChargePoint has 34 open roles on the board.

Read the original LinkedIn post. Curated by Larry Sherwood Jr. from company announcements; analysis above is my own.

Now Hiring
ChargePoint has 39 open roles on the board right now
Every listing links straight to their career system. No signup.
The Battery & Charging Market
438 open Battery & Charging roles tracked, refreshed nightly
Filter by function, state, and city on the free jobs board.
Related Guide
Workforce Planning for Hardware Launch Programs
98% offer acceptance on 48 AFEELA hires
Related Guide
The Four Talent Metrics Your Board Actually Tracks
$268 per hire across 782 hires
From the Author
The AFEELA U.S. launch: 48 hires, no agencies
How Larry built the Sony Honda Mobility of America team as its sole recruiter.
← All Mobility News